Opening a Restaurant in the Lower Mainland: Business Licence, Building Permit and Liquor Licence, Explained

You've found a space, you've got the menu, and you're ready to build. Then come the questions. Do I need a building permit? When does the health authority come in? What's the difference between a food primary and a liquor primary licence? Here's a plain guide for restaurant owners across the Lower Mainland and Whistler, with examples from Vancouver, Burnaby, Surrey, Richmond, Abbotsford, North Vancouver and Whistler.
Requirements vary by municipality; confirm with yours.
First: how Archivolt.ca helps
Archivolt.ca is a permits and drafting company serving restaurant owners and operators across the Lower Mainland. For restaurants, we handle change of use and tenant improvement permits, prepare the permit drawings and applications, support food primary and liquor licensing applications, and coordinate the registered professionals your municipality requires.
A restaurant needs several separate approvals
Opening a restaurant usually means several approvals from different offices:
A building permit for your fit-out (a tenant improvement, and often a change of use), from your municipality
Health authority approval of your plans, and later a health operating permit. That's Vancouver Coastal Health in Vancouver, and Fraser Health in Burnaby and Surrey.
A business licence from your municipality
A liquor licence from the province's Liquor and Cannabis Regulation Branch (LCRB), if you plan to serve alcohol
Other permits where they apply, such as signs and patios
Construction drawings for the fit-out
A development permit in some cases, to confirm the zoning allows this type of eatery within the business types approved for the zoning
One approval doesn't replace another.
Step 1: check zoning and use before you sign a lease
Before you commit to a space, check that a restaurant is allowed there.
City of Vancouver: check the proposed location with the Development and Building Services Centre before you lease or buy. A change of use may also need a development permit.
City of Burnaby: before applying for a building permit, contact Planning to confirm the use is permitted at the location, whether seating (or more seating) is permitted, and whether a development approval is required. (Burnaby food service guide)
City of Surrey: a Zoning Approval Letter, requested from Business Licensing, goes in your building permit application package. (Surrey tenant improvement permits)
City of Richmond: before you sign a lease, Richmond says it is "vital to confirm that the location is zoned correctly", and asks you to check with its Zoning Department whether the use fits the zone, and to confirm that minimum parking requirements can be met. A change of use or alterations need a building permit, and the business licence isn't processed until the permits are approved. (Richmond starting a business guide)
City of Abbotsford: every business needs a valid business licence, which Abbotsford says "ensures that all business locations meet zoning requirements". Restaurants are licensed as an Assembly business. (Abbotsford business licences)
In plain language, this means: find out if the space can legally be a restaurant before you sign anything. A lease on the wrong space can be very hard to fix later.
Archivolt.ca can check zoning and handle the change of use application where one is needed.
Step 2: health authority plan approval
BC's Food Premises Regulation says you can't build or alter a food premises until a health officer has approved the plans and specifications. You also can't operate a food premises unless its plans were approved and it is built and maintained to that approval.
Vancouver Coastal Health says floor plans must be reviewed and approved before construction begins, for new or renovated premises. An environmental health officer inspects on site before health approval, and every food service establishment needs a health permit, which doesn't transfer to a new owner. (VCH food service permits)
Fraser Health asks for plans to go to the environmental health officer before any construction begins. The health operating permit comes after the submissions are reviewed and the inspections are done.
Health plans usually show the preparation, cooking and dishwashing areas, washrooms, seating, storage, floor drains, equipment (such as the grease trap, range hood and sinks), lighting and finishes.
In plain language, this means: the health authority has to approve your kitchen and layout on paper before anyone starts building. Changing the layout later can mean going back to them.
Archivolt.ca prepares the drawings for your health authority submission.

Step 3: the building permit for your fit-out
You can always hire Archivolt.ca to check with the municipality and assess exactly what you can expect. Each municipality has its own set of rules, and what is permitted in Burnaby may not be permitted in Surrey. We do the field work so you know the expectations.
Here is how health approval links to the building permit in three municipalities:
City of Burnaby: Fraser Health-approved (stamped) plans are required as part of the building permit application package. Design changes during construction go back to Fraser Health.
City of Surrey: Fraser Health approval is required before the building permit is issued, and two sets of plans signed by a Fraser Health inspector go to the Commercial Section. A permit is needed for any new construction or alteration within a building, including commercial kitchen cooking equipment.
City of Vancouver: commercial kitchens need City-approved kitchen ventilation and fire protection systems. It also lists separate permits for occupant load, patios, signs and more. (Vancouver commercial permits) An occupancy permit is needed before you occupy commercial space, including after a change of use.
How the building code sees a restaurant
Under the BC Building Code, as Burnaby's guide explains it, a restaurant is an assembly occupancy (Group A-2). A small restaurant with 30 people or fewer can sometimes be classified as Group D, with a fire separation. Your occupant load affects things like the number of washrooms, the exits and the fire separations required. A new restaurant in an existing building may also have to be reclassified and upgraded to meet the current code.
In plain language, this means: the code treats a restaurant as a place where people gather, so it has stricter rules than a shop or office. The more people your space holds, the more the code asks for.
Kitchen exhaust and fire protection
Commercial kitchens need properly designed exhaust and fire protection. In Burnaby, the kitchen exhaust must be designed to NFPA 96, and the mechanical and fire suppression drawings must be engineer-sealed. In Surrey, fire department review applies to assembly uses over 60 people and to changes to life safety systems.
Letters of Assurance (Schedules A, B and C)
Municipalities set out which drawings and Letters of Assurance they require, and which registered professionals must sign them. For a restaurant, depending on the size and scope of the work, that can include sealed drawings and Letters of Assurance from the registered professionals involved. For example:
City of Surrey says each registered professional provides a signed and sealed Schedule B. It lists a mechanical engineer for cooking equipment, an electrical engineer for food service facilities, a structural engineer for structural changes, and a fire sprinkler professional where sprinklers change. A Schedule A is needed when more than one registered professional is involved.
City of Burnaby says that, depending on the complexity of the work or a change of use, a full set of Letters of Assurance, including Schedule A and Schedule B, may be required. Structural, mechanical and fire suppression drawings are engineer-sealed where they apply.
Resort Municipality of Whistler lists wet-sealed Schedule A and Schedule B letters of assurance among the documents for a commercial building permit. Its tenant improvement checklist asks for a wet-sealed Schedule B, sealed drawings and proof of professional liability insurance from each registered professional involved. Where food preparation or handling spaces are proposed, that includes a mechanical engineer and commercial kitchen drawings, along with Health Department approval. A structural engineer is added where structural work is proposed, and sprinkler engineering where the sprinkler system changes. (Whistler tenant improvement checklist)
City of North Vancouver asks for an electronically sealed Schedule B from every registered professional on a commercial tenant improvement, and a Schedule A from the coordinating registered professional when two or more are involved. The Permit to Practice number must be on all signed and sealed documents. (North Vancouver tenant improvement checklist)
City of Vancouver requires a Schedule A when more than one registered professional is involved in a commercial renovation. Each discipline provides its own sealed and signed Schedule B where the scope calls for it: structural for structural work, mechanical, plumbing and electrical for changes in a Part 3 building, and geotechnical for new excavation, additions or seismic upgrading. A commercial kitchen that is added or renovated also needs Vancouver's K1 restaurant or kitchen exhaust form, and a change of use needs a letter of operation. (Vancouver commercial renovation checklist)
In plain language, this means: Letters of Assurance are forms signed by the registered professionals your municipality requires. Each one signs a Schedule B for their part of the work, such as structural, mechanical or electrical. When more than one is involved, a Schedule A is needed too. Not every restaurant job needs them. It depends on the size and scope of the work and what your municipality requires.
Many factors are taken into consideration, such as seating, washroom layout, accessibility, equipment and vent inclusion, licence type and, of course, building type. Archivolt.ca prepares the permit drawings and coordinates with the registered professionals your municipality requires, so their schedules and sealed drawings arrive with a complete package. We aim to submit only what's needed, to avoid redundant expenditures.
Step 4: the business licence
City of Vancouver: all businesses need a licence to operate, and Vancouver Coastal Health inspects food businesses as part of the review.
City of Surrey: final approval of the tenant improvement building permit and a business licence are both required before you operate.
Archivolt.ca assists you in preparing for your business licence, or in some cases transferring one. Documents, procedures and requirements vary from municipality to municipality, so we take responsibility for creating an easy document flow for you, so your application is ready to submit.
Step 5: food primary or liquor primary?
If you want to serve alcohol, you'll need a licence from the LCRB. The two main types for restaurants and bars are:
Food primary: for places where the main focus is food, such as restaurants, bistros and cafes.
Liquor primary: a separate licence type with its own community input process.
The big difference is community input. Under the province's local government role page:
Liquor primary: a new licence, a relocation, a permanent hours change, or a structural change that adds capacity or a patio goes through a formal community input process, usually run by the local government. That can include a site notice, letters to neighbours or a public hearing.
Food primary: community input is generally needed only for certain things, such as a patron-participation endorsement (for example dine and dance or karaoke), or a permanent change to liquor-service hours before 9 am or after midnight.
Municipalities can also shape how you operate, through business licence terms and bylaws.
In plain language, this means: if your place is mainly about food, a food primary licence is usually the simpler path. If it's mainly about drinks, or you want late hours or entertainment, expect your neighbours and your municipality to have a say.
Archivolt.ca supports food primary and liquor licensing applications, including the floor plans that show your layout and capacity.
Don't forget signs
Signs usually need their own permit. In Surrey, a separate sign permit is needed for fascia, freestanding, awning or canopy signs before they go up, and a sign permit doesn't authorize you to occupy the space or open. Vancouver lists a sign permit for signs and awnings too. We are happy to work with your sign company or electrician to help them secure these permits.
Common mistakes
Signing a lease before checking zoning, use and seating
Starting construction before the health authority approves the plans
Changing the kitchen layout during construction without telling the health authority
Assuming a food primary licence never needs community input
Assuming that because an existing space serves food, it is already approved as a restaurant
Assuming that because something is allowed in one municipality, you can do the same in another
FAQ
Do I need a building permit to open a restaurant in an existing space? Usually, yes. A restaurant fit-out is usually a tenant improvement, and often a change of use. Check with your municipality.
What's the difference between food primary and liquor primary? Food primary is for places focused on food. Liquor primary is a separate licence type that, for a new licence (and for a relocation or a permanent hours change), goes through a formal community input process.
Does a food primary licence need public input? Generally not, but it can for things like patron-participation entertainment or liquor service after midnight or before 9 am.
Will I need Letters of Assurance (Schedules A, B and C)? Often, but not always. It depends on the size of the restaurant, the kitchen and the scope of work. Your municipality may ask for a Schedule B from each registered professional on the job, plus a Schedule A when more than one is involved. Archivolt.ca prepares the permit drawings and coordinates with the registered professionals your municipality requires, so their schedules and sealed drawings arrive with a complete package.
Related reading
Need a development permit too? See What's a Development Permit, and Why Do I Need One?
Changing something after your permit is issued? See Can You Change Your Plans After the Permit Is Issued?
Planning a restaurant?
Not sure what your space needs? Start with an Archivolt.ca feasibility report for your property and project. From there, we prepare your permit drawings and applications for change of use and tenant improvements, support your food primary and liquor licensing, and coordinate the registered professionals the job needs. Archivolt.ca helps restaurant owners across the Lower Mainland.
Call 604-442-4255 · Text/WhatsApp 604-649-2425 · Email info@archivolt.ca · Web archivolt.ca




Comments