You're planning a renovation, an addition or a new beam, and someone tells you, "You'll need an engineer for that." Sometimes that's true. Often it isn't. Here's a plain guide to when a structural engineer usually comes into a Lower Mainland job, and when the code's standard rules can do the work.

Requirements vary by municipality; confirm with yours.

First: how Archivolt.ca helps

Archivolt.ca is a permits and drafting company serving homeowners and contractors across the Lower Mainland. We prepare your permit drawings and coordinate with your engineer, so the structural pieces and the drawings line up when the application goes in.

The short answer: not every job

Most houses, duplexes and small multiplexes in BC fall under Part 9 of the BC Building Code. Part 9 covers smaller buildings (generally up to 3 storeys and a limited building area) used for things like housing, offices and shops. Larger buildings fall under Part 3, and those are professionally designed throughout.

Part 9 has prescriptive, "cookbook" rules for things like framing, spans and foundations. If your work fits those rules, your permit drawings can often show the structure without an engineer's design.

The City of Vancouver is a bit different. It uses its own Vancouver Building By-law instead of the BC Building Code, and that by-law adds its own situations where a registered professional is needed.

Three ways to meet the structural rules in Part 9

The structural section of Part 9 (BCBC Division B, 9.4.1.1) generally gives three routes for structural members and connections:

  • Follow the Part 9 prescriptive rules, such as the span tables for joists, rafters and beams.

  • Design to good engineering practice, such as the Canadian Wood Council's engineering guide for wood-frame construction.

  • Engineer it to Part 4, the code's full structural design section.

In many cases, the first route covers ordinary work. When something falls outside it, that's usually where an engineer comes in.

In plain language, this means: the code gives you a set of rules to build by. If your job fits those rules, you may not need an engineer. If it goes beyond them, such as a beam carrying a heavy concentrated load, an engineer designs that part.

Attic interior with exposed timber beams and rafters

When a registered professional is usually needed

Under the code (Division C, 2.2.7.1), a registered professional's design and field review is needed in an ordinary Part 9 building for the parts that fall outside Part 9's scope, including:

  • Structural components outside Part 9, and

  • Geotechnical (soil and site) conditions outside Part 9.

The Province's Guide to the Letters of Assurance gives common examples. Things that often trigger an engineer include:

  • Beams carrying point loads. A beam that picks up a concentrated load, for example from a post above, falls outside Part 9 and needs an engineer's design. The Province's guide says beams with non-uniform or concentrated loads fall within Part 4 and require Letters of Assurance. This is the usual reason removing a load-bearing wall ends up with an engineer: the new beam often carries point loads.

  • Girder trusses, trusses spanning more than 12.2 m, and proprietary engineered products, plus heavy floor loads.

  • Foundation and soil issues, such as underpinning, poor soils, slopes, deep foundations or shoring. Raising a house usually involves new foundation work, and that often brings in an engineer.

  • Wind and seismic bracing. Large openings or walls that don't meet the Part 9 bracing tables often need engineering. The Province notes the bracing rules were substantially revised in the 2024 code.

Additions don't automatically need an engineer. They need one when they include something like the items above.

If unexpected soil conditions turn up during excavation, the Province's guide says the excavation should stop and the owner must retain a geotechnical registered professional, who then provides the design and a Schedule B.

Your municipality can ask for more

The code sets a baseline, and municipalities can add to it. For example, the City of Burnaby's building bylaw lets its building inspector require a registered professional where site conditions, size or complexity warrant it. Vancouver's building by-law adds its own triggers too. So even when the code alone wouldn't call for an engineer, your municipality may.

In Vancouver, structural changes aren't eligible for the Residential Renovation Fast Track, and structural repairs or changes need a permit.

Retaining walls: municipal rules matter most

Site retaining walls that don't hold up a building's foundation are generally regulated by municipal bylaws rather than the Building Code. The Province says professional design is important, particularly when the height of retained soil exceeds 1.2 metres. Some examples:

  • City of Burnaby: walls over 1.2 m, and certain terraced walls, need a permit, sealed structural drawings and a Schedule B. (Burnaby retaining walls)

  • City of Richmond: walls over 1 m above the lower grade need a permit and design by a professional engineer. Lower walls may be able to follow the municipality's wood retaining wall guideline. (Richmond bulletin)

  • City of Surrey: a permit is needed for walls over 1.2 m greater than 1.2 m when the supporting ground is critical to the stability of building foundations, or when the wall is on a sloping hillside. A registered professional provides a Schedule B. (Surrey retaining wall permits)

  • City of Vancouver: the Vancouver Building By-law requires retaining structures over 1.2 m in height to be designed to the requirements of the "Assurance Statement" in Engineers and Geoscientists BC's retaining wall design guidelines. New retaining walls generally need a permit in Vancouver as well. (Province's Guide to the Letters of Assurance)

What happens when an engineer is involved

The steps often look like this:

  1. We help you source the right engineer for your project. Archivolt.ca prepares the drawings and sends the engineer what they need, and works with them so the structural pieces and the drawings line up.

  2. The engineer designs the structural pieces and issues sealed structural drawings plus a Schedule B, listing the components they're responsible for. The Schedule B goes to the municipality before those components are built, and in practice it usually goes in with the permit application.

  3. Field reviews. The engineer reviews those components on site during construction.

  4. Schedule C-B. At the end, the engineer confirms their obligations were met, and the Schedule C-B goes to the municipality before final inspection or occupancy.

Letters of Assurance are generally not meant for Part 9 buildings, but the Province notes that municipalities often choose to use them, so expect them when an engineer is on your job.

Common mistakes

  • Assuming every renovation needs an engineer, or that none do

  • Removing a load-bearing wall without checking what the new beam will carry

  • Building a retaining wall without checking your municipality's height rules

  • Forgetting the Schedule C-B at the end of the job

  • Assuming the code is the only rule: your municipality can ask for more

FAQ

Does removing a load-bearing wall need an engineer? Often, yes. The replacement beam commonly picks up point loads from posts above, and beams carrying point loads fall outside Part 9 and need an engineer's design. It depends on the job, and your municipality decides what it needs to see.

Do I need an engineer for a retaining wall? It depends on the height, the location and your municipality. Burnaby, Richmond and Surrey each set their own thresholds, so check yours before you build.

Who hires the engineer? The owner is the one who retains the engineer (Burnaby's bylaw, for example, puts this on the owner), and Archivolt.ca helps you find the right one.

What is a Schedule B, and a Schedule C-B? They're Letters of Assurance. In a Schedule B, the engineer takes responsibility for designing and reviewing certain components. In a Schedule C-B, they confirm they fulfilled the design and field review obligations they took on in the Schedule B. It's submitted after the work is complete and before final inspection or occupancy.

Does the 2024 code change any of this? The BC Building Code 2024 took effect for building permits applied for on or after March 8, 2024. Its seismic requirements were phased in later, from March 10, 2025. It substantially revised the Part 9 rules for bracing walls against wind and earthquake, and it has been amended since, most recently by Revision 7, effective September 21, 2026. Which edition and revision apply depends on when your permit was applied for, so check with your municipality. The City of Vancouver uses its own Vancouver Building By-law.

Related reading

Not sure if your job needs an engineer?

Not sure what your project needs? Start with an Archivolt.ca feasibility report for your property and project. From there, we prepare your permit drawings and coordinate with your engineer where the job needs one. Archivolt.ca helps homeowners and contractors across the Lower Mainland with permit drawings, permit applications and municipal liaison.