Board of Variance: How Archivolt.ca Helps You Cut Through the Red Tape

18 hours ago
5 min read
Kostas Nikolaou, The Permit Guy at Archivolt.ca

Your design is a little over a setback. Or the lot is odd-shaped, sloped, or has a big tree right where the addition needs to go. The zoning bylaw says no, and redesigning around it would cost you the project. That's what the Board of Variance is for.

The Board of Variance is an independent board that every BC municipality with a zoning bylaw must have (Vancouver's is set up under the Vancouver Charter). It can give relief from certain zoning rules when following them strictly would cause real hardship. Archivolt.ca helps you navigate that process from start to finish. We put together the argument, prepare the drawings and evidence, and present your case to the Board.

Two sets of rules: Vancouver and everyone else

The first thing to know is that the rules depend on where your property is. Vancouver and the rest of the Lower Mainland run under different laws, and the tests are not the same.

Most Lower Mainland municipalities (Local Government Act, s.540 to 542). This covers Burnaby, Surrey, Richmond, the North Shore, the Tri-Cities, Delta, the Langleys and New Westminster. You can apply if a bylaw on the siting, size or dimensions of a building causes you hardship. You can also apply if the rule against altering or adding to a non-conforming building, or a tree bylaw, causes you hardship. For bylaw rules, the Board can allow only a minor variance. It must hear from you and from notified neighbours (owners and tenants of adjacent land), and it must find undue hardship. It must also find that the variance does not:

  • result in inappropriate development of the site,

  • harm the natural environment,

  • substantially affect the use and enjoyment of adjacent land,

  • vary permitted uses or density,

  • defeat the intent of the bylaw, or

  • touch residential rental tenure.

The Board can't override a section 219 covenant, a land use permit or contract, a phased development agreement, a flood plain specification, or protected heritage property. Its decision is final. If permission is granted, construction must be substantially started within two years or the permission lapses.

Vancouver (Vancouver Charter, s.573). Vancouver's Board of Variance has a broader role. It hears appeals of zoning decisions, including decisions of the Director of Planning. It also hears hardship cases about the siting, size, shape or design of a building that arise from "peculiarities in the site or special circumstances." To allow an appeal, the Board must find that the hardship applies to that property only, and that applying the bylaw strictly would impose an unreasonable restraint that is inconsistent with the bylaw's intent. The appeal also can't disrupt the official development plan. An appeal can never be allowed just because the land could be put to "a more profitable use." The Board can attach conditions, a tie vote means the appeal is denied, and there is no further appeal.

In plain terms: Outside Vancouver, the Board can approve small changes to size or siting rules when your site makes the rule unfair, as long as neighbours and the bylaw's purpose aren't harmed. In Vancouver, the Board can also hear appeals of planning decisions, but the hardship has to come from your property itself, never from wanting more profit. Outside Vancouver, the law bars the Board from varying use or density. In Vancouver, the hardship power covers siting, size, shape and design.

What the Board can and can't do

The Board of Variance deals with zoning bylaws. It does not deal with the BC Building Code, and it does not issue permits. It grants a variance or allows an appeal. You still need your building permit afterward.

In plain terms: A Board decision clears a zoning hurdle. It doesn't replace your permit or change building safety rules.

How Archivolt.ca makes your case

A Board of Variance hearing is decided on what you put in front of the Board. A strong package is clear, specific and honest about what you're asking for. Here's what we put together.

Archivolt.ca drawing set cover page with project address and owner details blurred

1. A hardship argument tied to the site. Boards look for hardship that comes from the land: the lot shape, a slope, an existing building, or protected trees. Personal preference or cost is not enough. Boards also commonly weigh whether the hardship was created by the owner. That isn't written in the statute, but showing the problem came with the site is a strong point in your favour.

2. The smallest relief that solves the problem. We show that what you're asking for is the minimum needed, and that it still fits the purpose of the bylaw. A focused request is easier for a Board to support than a broad one.

3. Drawings and evidence on neighbour impact. Neighbours are notified and can speak at the hearing. We prepare scaled drawings with exact measurements, site photos, and shadow or privacy studies where they're relevant, so the Board can see the real effect on adjacent properties.

4. Neighbour letters. We help you reach out to neighbours early and collect letters where they're willing to support the request.

5. Grounds stated up front. In Vancouver, the Board won't consider grounds that weren't stated in the notice of appeal (By-law 10200, s.5.4). We make sure every point we plan to argue is in the filing from day one.

In plain terms: We show the Board that your site causes the problem, that you're asking for as little as possible, and that your neighbours won't be hurt. We back it up with drawings, photos and letters, and we make sure nothing important is left out of the paperwork.

We present it to the Board

Archivolt.ca can prepare and file your appeal and present it to the Board as your agent.

Overhead view of an empty U-shaped boardroom table ready for a hearing

In Vancouver, an owner or an agent on their behalf may file, and at the hearing the Chair calls on the appellant or their agent to present. The owner doesn't have to attend. The Board can proceed in the owner's absence if that's requested in writing beforehand (By-law 10200, s.5.5). The appeal stays in your name: you're the appellant and you sign, and we act as your agent. Other municipalities set their own hearing procedures by bylaw, so we confirm how your Board handles agents before we file.

At the hearing, the Director of Planning in Vancouver, or municipal staff elsewhere, will also be heard. We work with staff, not against them. A respectful, well-prepared presentation gives the Board what it needs to decide.

In plain terms: You stay the owner of the appeal and sign the forms, but we can do the filing and speak for you at the hearing. In Vancouver you don't even have to be there if the Board is told in writing ahead of time.

Before you file

  • Check that your issue is a zoning matter, not a Building Code question.

  • Make sure you're not asking for a change in use or density. That's a rezoning conversation.

  • Check your municipality's current fee, deadline and hearing schedule. They change, so confirm them at the time you apply.

Requirements vary by municipality; confirm with yours.

Ready to make your case?

If a zoning rule is standing between you and your project, Archivolt.ca can review your site and the bylaw, tell you whether the Board of Variance is the right route, and build and present your case. We help you source the right engineer for your project.